Winners named for £240m Network Rail steel supply deal
The winning firms have been confirmed for a £240m Network Rail framework to supply steel products and structures for overhead line equipment (OLE) across the UK.
The largest packages are £99m for steel structures and £70m for steel piles.
The winning firms are:
Steel Piles (£70m):
Adey Steel
European Active Projects
Severfield Structural Solutions
Steel Structures (£99m):
Adey Steel
Fullmen
Pro Steel Engineering
Taziker Industrial
Other winners for the smaller lots include:
Associated Utility Supplies
Folglade (Pipes and Fittings)
Railability
Trackwork
Associated Utility Supplies
Balfour Beatty Rail
Furrer + Frey GB
Gripple
The contracts are set to start in January 2027 and last for a minimum of six years with a possible two-year extension.
Winners named for £240m Network Rail steel supply deal | Construction Enquirer News
News by Category
- BECBC
- Cumbria
- Nuclear
- Social Value
- Professional Services
- Clean Energy
- Business
- People
- Government
- BECBC Member News
